Zarlink
Chiller
Zarlink, a Swindon-based semiconductor company,
required a new chiller system situated on a gantry
twelve metres off the floor. We sought the services
of King Lifting Ltd and one of their largest cranes
to replace their system with two new chillers from
France. Once in place, we completed the pumpwork
installations and reconnected the system to the
water lines. Completed in Christmas 2004, this eight-week
project proved a big success.